GAIN funds companies’ work with ORNL on reactor siting and reprocessing

October 13, 2022, 9:30AMNuclear News
An aerial view of ORNL’s main campus. (Photo: ORNL)

The Gateway for Accelerated Innovation in Nuclear (GAIN) announced the three recipients of its fourth and final round of 2022 vouchers on October 10. The vouchers were awarded to Curio Solutions, which is developing a spent fuel recycling process, and to two companies that are separately investigating advanced reactor siting—Elementl Power and the Tennessee Valley Authority (TVA). The funds for each award will go directly to Oak Ridge National Laboratory.

Draft EIS for fluoride salt–cooled test reactor now out for public comment

October 3, 2022, 3:06PMNuclear News
An artist’s rendering of Hermes. (Image: Kairos Power)

The Nuclear Regulatory Commission issued a draft environmental impact statement (EIS) recently on Kairos Power’s application for a permit to construct Hermes, a 35-MW nonpower version of the company’s fluoride salt–cooled reactor design (KP-FHR), at the East Tennessee Technology Park in Oak Ridge, Tenn.

TVA, GEH advance SMR plans for Clinch River site

August 8, 2022, 7:20AMNuclear News
Rendering of the proposed GEH Nuclear Energy BWRX-300 SMR at the Clinch River site. (Image: GE Hitachi)

The Tennessee Valley Authority and GE Hitachi Nuclear Energy (GEH) have signed an agreement to support planning and preliminary licensing for the potential deployment of a BWRX-300 small modular reactor at the Clinch River site near Oak Ridge, Tenn., the utility’s president and chief executive officer, Jeff Lyash, announced last week.

An evolution of GEH’s 1,520-MWe Generation III+ ESBWR design, the BWRX-300 is a 300-MWe water-cooled, natural-circulation SMR with passive safety systems.

TVA seeks 5 GW of clean energy, requires availability before 2029

July 13, 2022, 3:00PMNuclear News
TVA's Watt Bar nuclear power plant.

As part of its strategy to achieve net-zero status by 2050, the Tennessee Valley Authority yesterday issued a request for proposals for supplying up to 5 GW of carbon-free energy that must be operational before 2029.

NN Asks: How do a meteorologist’s forecasts shape nuclear utility planning?

July 6, 2022, 12:06PMNuclear News


Jennifer Call, Meteorologist:
When you think of a meteorologist, what is the first thing that comes to mind? For many it is your local TV meteorologist delivering a weathercast for the 5 o’clock news, or perhaps a meteorologist at the National Weather Service issuing severe storm warnings. But did you know that utilities rely on meteorologists for daily support?


Jennifer Call (jtcall@tva.gov) is an American Meteorological Society Certified Consulting Meteorologist (CCM) and an atmospheric analyst for the Tennessee Valley Authority. She serves on the ANS Standards Board and is the Atmospheric Subcommittee chair under the Environmental and Siting Consensus Committee.

U.S. nuclear capacity factors: A smaller fleet invested in the future

May 13, 2022, 2:59PMNuclear NewsSusan Gallier

The United States has just 93 operating power reactors at this writing. The fleet last numbered 93 in 1985, when nuclear generation topped out at 383.69 TWh, less than half of the 778.2 TWh produced in 2021.

While the 93 reactors operating today have more capacity, on average, than in 1985, most of that increased productivity is down to operational improvements that pushed the fleet’s average capacity factor from just 57.5 percent in the three-year period 1984–1986 to near 90 percent by the early 2000s.

Kairos Power forms advisory consortium with four nuclear utility partners

April 20, 2022, 12:00PMNuclear News

Kairos Power announced today that it has assembled an advanced nuclear development advisory consortium with four North American nuclear operators—Bruce Power, Constellation, Southern Company, and the Tennessee Valley Authority—dubbed Kairos Power Operations, Manufacturing and Development Alliance (Kairos Power-OMADA).

Clinch River in the Spotlight

February 17, 2022, 3:15PMANS Nuclear Cafe
An advanced nuclear reactor technology park is hoped for the 935-acre Clinch River site. Image: TVA

Last week’s announcement from the Tennessee Valley Authority about its “New Nuclear Program,” which outlines the potential development of the Clinch River site near Oak Ridge National Laboratory in Eastern Tennessee, is the catalyst for this week’s #ThrowbackThursday post. The Clinch River site was originally planned to be the location for the Clinch River Breeder Reactor, a project that, at the time, was meant to be the future of the nuclear industry in the United States.

TVA board approves advanced reactor program; initial focus on Clinch River

February 11, 2022, 9:30AMNuclear News
An advanced nuclear reactor technology park is hoped for the 935-acre Clinch River site. Image: TVA

The Tennessee Valley Authority’s board of directors has given the go-ahead for a program that will explore the development and potential deployment of small modular reactors as part of the utility’s decarbonization strategy.

Tennessee governor gives nuclear another rhetorical boost

February 3, 2022, 7:22AMNuclear News

Lee

In his annual State of the State Address on January 31, Tennessee Gov. Bill Lee offered more praise for nuclear energy, after lauding it earlier in the month during a tour of the Tennessee Valley Authority’s Watts Bar nuclear plant

“For decades, East Tennessee has been home to some of the best-kept secrets in nuclear energy and American innovation,” Lee told the state’s General Assembly. “Today, many may not realize that Tennessee derives more power from nuclear energy than from any other source. Recently, I visited the TVA’s Watts Bar nuclear facility, the last nuclear facility to be built in America, to see firsthand how nuclear power keeps our grid dependable even when the weather is not. Nuclear power is clean energy that actually works for the private sector.”

Tennessee governor backs nuclear energy and TVA's plans for SMRs

January 25, 2022, 3:00PMANS Nuclear Cafe

During a tour last week of the Tennessee Valley Authority’s two-unit Watts Bar nuclear power plant in Tennessee, Gov. Bill Lee said, "Nuclear energy is so important not only because it is an important part of TVA's power generation but also because of the value that clean energy via nuclear energy can have for sustainability in this country,” according to an article in the Chattanooga Times Free Press.

Lee added that he would support TVA’s plans if it decided to build small modular reactors.

TVA gives up construction permits for Bellefonte units

September 22, 2021, 7:02AMNuclear News

Nearly 47 years after being issued construction permits for two reactors at the Bellefonte site in northeast Alabama, the Tennessee Valley Authority has decided against renewing them, essentially extinguishing any remaining hope for the project, on which the utility has reportedly spent more than $5 billion.

Woke nuclear?

September 15, 2021, 3:00PMANS Nuclear CafeMaureen T. Koetz

DISCLAIMER: The views expressed in posted articles do not necessarily reflect the views of the American Nuclear Society. The views expressed here are those of the individual authors. ANS takes no ownership of their views. The American Nuclear Society assumes no responsibility or liability for any use or operation of any methods, products, instructions, or ideas contained on this site.

After decades of relinquishing its value and return on investment as “emission-free” electricity generation, segments of the nuclear industry are pursuing actions in several states to secure emission credits for avoiding greenhouse gas emissions. To harmonize electricity market stability and greenhouse gas emission reduction goals, states such as New York and New Jersey have enacted programs to award zero emission credits (ZECs) to nuclear plants for their emission-free output.

Dearly earned and too long forgone, air emission credits have been the economic birthright of the nuclear industry since the passage of the 1990 Clean Air Act (CAA) amendments, when emission control capability first became a tradable commodity. Yet it took until 2016 for ratepayers and shareholders to receive even a small fraction of this valuable return on investment.

Court finds no breach of contract in failed Bellefonte sale

August 30, 2021, 12:00PMNuclear News
Bellefonte nuclear power plant (Photo: TVA)

A federal court last week sided with the Tennessee Valley Authority in its legal dispute with Nuclear Development LLC over the proposed sale of the unfinished Bellefonte nuclear power plant. The court, however, also ordered the utility to refund millions to Nuclear Development over the aborted transaction.

TVA's OIG spots “high” risks in Sequoyah chemistry program

July 14, 2021, 9:30AMNuclear News
Sequoyah nuclear power plant (Photo: Photorush/Wikimedia Commons)

In an evaluation report released last week on the Sequoyah nuclear plant’s chemistry/environmental program, the Tennessee Valley Authority’s Office of the Inspector General identified certain risks, both behavioral and operational, that could impact organizational effectiveness. Program behavior was assessed from interviews and field work conducted from September 21 through November 3, 2020, with operations assessed in February of this year.

2020 enforcement cases rise but still below five-year average

June 22, 2021, 9:29AMNuclear News

The Nuclear Regulatory Commission recently released its Enforcement Program Annual Report for calendar year 2020, showing a total of 61 escalated enforcement actions taken last year against licensees, non-licensees, and individuals—an increase of 7 percent from CY 2019, but a number that remains below the five-year (2016–2020) average.

TVA and Kairos partner on demonstration reactor

May 6, 2021, 3:00PMNuclear News
Artist’s rendering of Kairos Power’s KP-FHR reactor. (Image: Kairos Power)

The Tennessee Valley Authority and nuclear technology and engineering company Kairos Power this morning announced plans to collaborate on the deployment of the latter’s low-power demonstration reactor, dubbed Hermes, at the East Tennessee Technology Park (ETTP) in Oak Ridge, Tenn. TVA will provide engineering, operations, and licensing support to help Kairos with deployment, according to the announcement.

Company settles dispute with TVA over Watts Bar project

April 27, 2021, 12:04PMNuclear News
Watts Bar nuclear power plant in Tennessee

Construction and maintenance services firm Day & Zimmermann (D&Z) has paid $200,000 to resolve allegations that it submitted false claims to the Tennessee Valley Authority for services performed in connection with capital improvement projects at the Watts Bar nuclear plant, the U.S. Attorney’s Office for the Eastern District of Tennessee announced last week.

Senate hearing to focus on nuclear energy

March 24, 2021, 3:00PMANS Nuclear Cafe

The U.S. Senate Energy and Natural Resources Committee (ENR) will hold a hearing on Thursday, March 25, to examine the latest developments in the nuclear energy sector, with a focus on ways to maintain and expand the use of nuclear energy in the United States and abroad.

The hearing can be viewed live at 9:45 a.m. EST. More information about the hearing is available online.

Browns Ferry-2 outage to include turbine work, loading of 3D-printed parts

March 2, 2021, 12:04PMNuclear News

A replacement rotor is lifted and staged for the upcoming Browns Ferry-2 turbine work. Photo: TVA

The Tennessee Valley Authority has begun a refueling and maintenance outage at Browns Ferry-2 that includes the largest scope of turbine deck work since the unit’s construction, as well as innovations in fuel assembly components, the utility announced on March 1.

On deck: All three of the 1,254.7-MWe boiling water reactor’s low-pressure turbines will undergo a comprehensive replacement of major components, including new rotors, inner casings, steam piping and bellows, and turbine supervisory instruments, requiring the support of more than 500 additional outage workers. TVA said that 600 crane lifts will need to be performed for some components, such as the rotors, which weigh up to 327,888 lb., and inner casings, which weigh up to 200,000 lb.