Power & Operations


Exelon, EDF ask NY to okay proposed nuclear deal

July 28, 2020, 9:27AMNuclear News

Exelon Generation and Électricitéde France have asked the New York Public Service Commission to approve the transfer of EDF’s 49.99 percent ownership interest in Constellation Energy Nuclear Group (CENG) to Exelon, which owns 50.1 percent. CENG is the owner of New York’s Ginna and Nine Mile Point nuclear plants, as well as Maryland’s Calvert Cliffs.

DFC drops prohibition on nuclear project financing

July 28, 2020, 7:02AMNuclear News

The U.S. International Development Finance Corporation (DFC) has lifted its ban on financing nuclear power projects abroad. Last month, the DFC proposed the change to its Environmental and Social Policy and Procedures, which had specifically prohibited it from offering such support.

The change, announced by the DFC on July 23, also implements a key recommendation made in an April 2020 report issued by the U.S. Nuclear Fuel Working Group, an interagency initiative to review and modernize U.S. nuclear energy policy.

Former SCANA exec pleads guilty in Summer fraud case

July 27, 2020, 9:59AMNuclear News

Stephen A. Byrne, former executive vice president of SCANA Corporation, pleaded guilty in federal court on July 23 to conspiracy to commit mail and wire fraud in connection with the failed $9-billion nuclear-expansion project at South Carolina’s Summer plant.

Byrne, 60, had also been president of generation and transmission and chief operating officer at SCANA subsidiary South Carolina Electric & Gas, overseeing all of SCANA’s nuclear operations, including the construction of the new nuclear units, on which work was stopped in 2017 (NN, Aug. 2017, p. 17).

Senate passes defense bill with advanced nuclear provisions

July 27, 2020, 7:07AMNuclear News

In an 86 to 14 vote, the Senate on July 23 passed the National Defense Authorization Act (NDAA) for Fiscal Year 2021, incorporating by amendment S. 903, the Nuclear Energy Leadership Act (NELA). The House of Representatives passed its version of the NDAA, which supports $740 billion in funding for national defense, earlier in the week in a less bipartisan manner, 295 to 125. Members of both chambers will now begin negotiations to hammer out a final bill to send to the president—a process that could take months.

Limerick’s safe outage during the pandemic: A refueling success story

July 24, 2020, 3:38PMNuclear NewsBryan Hanson

Limerick Nuclear Power Plant

Refueling a nuclear reactor under normal circumstances can be a challenging endeavor, with hundreds of maintenance activities and inspections to perform in a short window of time, and more than a thousand supplemental workers on-site to complete the work safely and effectively. But these are anything but normal circumstances.

For good jobs, nuclear blows wind away, report says

July 24, 2020, 9:31AMNuclear News

A new report from the World Nuclear Association asserts that the nuclear sector provides more and better-paying jobs, as well as more highly trained jobs, than does the wind sector, and by a substantial margin. According to the 20-page report, Employment in the Nuclear and Wind Energy Generating Sectors, nuclear provides approximately 25 percent more employment per unit of electricity generated than does wind.

Feds arrest Ohio lawmaker who pushed nuclear subsidy bill

July 24, 2020, 7:11AMNuclear News

Householder

Federal prosecutors on July 21 arrested the Speaker of the Ohio House of Representatives, Larry Householder, and four lobbyists and political consultants for their involvement in an alleged $61-million corruption and racketeering scheme aimed at guaranteeing passage of H.B. 6, the Ohio Clean Air Program Act—the measure that rescued Ohio’s Davis-Besse and Perry nuclear power plants from premature closure. If convicted, Householder et al. face up to 20 years in prison.

Santee Cooper, Dominion agree to pay $520 million in Summer suit

July 23, 2020, 9:28AMNuclear News

A circuit court judge on July 20 gave final approval to a $520-million settlement in a class action civil suit brought against Santee Cooper over alleged deceptive business practices involving the failed nuclear-expansion project at South Carolina’s Summer plant.

Santee Cooper was the junior partner to SCANA Corporation’s South Carolina Electric and Gas in the two-reactor project, which was canceled in July 2017 (NN, Aug. 2017, p. 17). In July 2019, SCANA became a wholly owned subsidiary of Virginia-based Dominion Energy (NN, Feb. 2019, p. 15).

According to the lawsuit, brought by ratepayers, Santee Cooper raised rates to cover the increasing costs of the Summer expansion even after becoming aware that the project was no longer viable.

Hydraulic testing completed on Akkuyu-1 reactor vessel

July 22, 2020, 11:49AMNuclear News

The Akkuyu-1 reactor pressure vessel. Photo: Atomenergomash

Atommash has completed hydraulic testing of the reactor pressure vessel for Unit 1 at the Akkuyu nuclear power plant, the four-unit facility currently under construction on the Mediterranean coast in southern Turkey. Atommash is part of Atomenergomash, the engineering division of Rosatom, which is Russia’s state atomic energy agency.

Operating license renewed for Laguna Verde-1

July 22, 2020, 9:25AMNuclear News

Mexico’s Laguna Verde nuclear power plant. Photo: HFStudios

Mexico’s Ministry of Energy (SENER) announced on July 17 that it has approved the renewal of the operating license for Unit 1 at Laguna Verde, the country’s only nuclear power plant.

Laguna Verde is located on the coast of the Gulf of Mexico, in the state of Veracruz. Unit 1 is a General Electric–supplied 777-MWe BWR-5 boiling water reactor that began commercial operation 30 years ago this month. Its near-twin Unit 2, rated at 775 MWe, first came on line in April 1995.

Sixty-day extension for comments on proposed SMR rule

July 22, 2020, 7:12AMNuclear News

The Nuclear Regulatory Commission has extended the deadline for comments on its “Proposed Rule for Emergency Preparedness for Small Modular Reactors and Other New Technologies” to allow more time for members of the public and other stakeholders to develop and submit their comments. The proposed rule and associated draft regulatory guide apply to non-light-water reactors and certain nonpower facilities, and were originally published in the Federal Register on May 12 with a deadline of July 27. The new deadline is September 25.

Record low uranium production noted as Congress debates reserve funding

July 21, 2020, 3:03PMNuclear News

Uranium producers around the world have suffered through years of record low uranium prices. In 2019 the United States recorded its lowest total uranium production—174,000 lb U3O8—since the U.S. Energy Information Administration began collecting data in 1949, according to the agency’s Today in Energy analysis of July 17.

U.S. uranium producers asked the federal government to come to their aid in January 2018, and President Donald Trump created the U.S. Nuclear Fuel Working Group (NFWG) in July 2019. While the NFWG issued a report in April 2020 recommending support for the front end of the nuclear fuel cycle, uranium producers are in a waiting game once again as the U.S. House of Representatives works on Fiscal Year 2021 appropriations legislation.

Fuel loading begins at Leningrad II-2

July 21, 2020, 11:57AMNuclear News

Technicians at the Leningrad II-2 plant, where fuel loading recently took place. Photo: Rosenergoatom

The first of 163 nuclear fuel assemblies has been loaded into Leningrad II-2, marking the beginning of the Generation III+ unit’s physical startup, Rosenergoatom announced on July 19.

The electric power division of Rosatom, Russia’s state-owned atomic energy corporation, Rosenergoatom is the operator of all of Russia’s nuclear power plants. The fuel for Leningrad II-2, a 1,085-MWe VVER-1200 pressurized water reactor, was manufactured at the Novosibirsk Chemical Concentrates Plant, part of Rosatom subsidiary TVEL.

New design center supports construction of Hinkley Point C

July 21, 2020, 9:38AMNuclear News

UK EPR Design Centre, Bristol, England. Image: EDF Energy

EDF Energy has opened a new engineering design facility in Bristol, England, to support the next phase of construction at the Hinkley Point C nuclear power station in Somerset, the company announced on July 14. The UK EPR Design Centre at Aztec West brings together nuclear designers and engineers from EDF and British engineering partners and suppliers, including Framatome UK, Atkins, Jacobs, Assystem, Anotech, and Vulcain, the announcement said.

Thought leaders on capacity factors and nuclear power

July 21, 2020, 7:13AMNuclear NewsSherry Bernhoft, Joel Eves, Margaret Harding, Jessica Lovering, Peter Lyons, Lisa Marshall, Craig Piercy, Edward (Ted) Quinn, Kelly Rae, Randy T. Simmons, Samuel Thernstrom, Doug True, Dan Yurman

This article first appeared in the May 2020 issue of Nuclear News.

Nuclear News reached out to leaders in the nuclear community to ask them for their views on the capacity benefits that come from nuclear. We received wide-ranging responses, from how capacity factors provide examples of the excellence of nuclear professionals, to the work being done at universities to continually improve capacity factors, to the importance of adding the word “inherent” to the conversation because forms of energy are different from one another and so inherent capacity factor is a critical piece of understanding.

If you have your own thoughts about capacity factor, please let Nuclear News know. If we collect enough comments, it may result in a Part 2 of this article in the future.

Construction of UAE’s Barakah-2 completed

July 20, 2020, 10:25AMNuclear News

The UAE’s Barakah nuclear power plant. Photo: ENEC

The Emirates Nuclear Energy Corporation (ENEC) has completed construction of Unit 2 at the Barakah nuclear plant, the company announced on July 14. The plant, the Arab world’s first such facility, is located in the Al Dhafra region of Abu Dhabi, the United Arab Emirates’ capital city.

Hot functional testing of the unit had been completed in August 2018, followed by structural integrity testing and integrated leak rate testing in March last year.

With construction complete, the unit has now been officially turned over to Nawah Energy Company, ENEC’s operating and maintenance subsidiary. According to the announcement, the focus at Barakah-2 now shifts to completing the operational readiness preparations, regulatory inspections, and international assessments required for obtaining an operating license from the Federal Authority for Nuclear Regulation, the UAE’s nuclear regulator.

Palo Verde takes home 2020’s top TIP

July 20, 2020, 7:01AMNuclear News

A team from Arizona Public Service’s (APS) Palo Verde nuclear plant, in Wintersburg, Ariz., has won the Nuclear Energy Institute’s “Best of the Best” Top Innovative Practice (TIP) Award for developing in-house software applications that use machine learning to automate such time-consuming tasks as screening reports or searching maintenance logs. The award was announced July 9 during NEI’s first-ever virtual TIP Awards presentation.

Remote fuel cleaning from across the globe

July 17, 2020, 3:43PMNuclear NewsRick Michal

Around the world in the mid-March time frame, conditions were changing rapidly due to the COVID-19 pandemic, as was everyone’s understanding of it. For nuclear power plants, the pandemic meant dealing with new government regulations and restrictions that were put in place. “U.S.-based support of international clients was especially challenging,” said Mike Little, president and principal officer of Reston, Va.–based Dominion Engineering Inc. (DEI). “With border closures going into effect, we were not only focusing on the health and safety of our workers abroad, but also making sure they would be able to return home. Providing remote subject matter expertise from the U.S. through our international service partners was critical to successful job execution during this time.”

Record-setting run for Darlington-1

July 17, 2020, 7:32AMNuclear News

Unit 1 of Canada’s four-unit Darlington nuclear power plant, located in Clarington, Ontario, set a North American record on July 9 with 895 consecutive days of operation, according to Ontario Power Generation (OPG), the plant’s owner and operator.

The previous record of 894 days was held by Pickering-7, also part of OPG’s nuclear fleet. The reactors at the Darlington and Pickering plants are CANDU pressurized heavy-water reactors. Darlington-1, an 878-MWe PHWR, has been on line since January 26, 2018.