ANS is committed to advancing, fostering, and promoting the development and application of nuclear sciences and technologies to benefit society.
Explore the many uses for nuclear science and its impact on energy, the environment, healthcare, food, and more.
Explore membership for yourself or for your organization.
Conference Spotlight
2025 ANS Winter Conference & Expo
November 9–12, 2025
Washington, DC|Washington Hilton
Standards Program
The Standards Committee is responsible for the development and maintenance of voluntary consensus standards that address the design, analysis, and operation of components, systems, and facilities related to the application of nuclear science and technology. Find out What’s New, check out the Standards Store, or Get Involved today!
Latest Magazine Issues
Sep 2025
Jan 2025
Latest Journal Issues
Nuclear Science and Engineering
October 2025
Nuclear Technology
September 2025
Fusion Science and Technology
Latest News
A webinar, and a new opportunity to take ANS’s CNP Exam
Applications are now open for the fall 2025 testing period for the American Nuclear Society’s Certified Nuclear Professional (CNP) exam. Applications are being accepted through October 14, and only three testing sessions are offered per year, so it is important to apply soon. The test will be administered from November 12 through December 16. To check eligibility and schedule your exam, click here.
In addition, taking place tomorrow (September 19) from 12:00 noon to 1:00 p.m. (CDT), ANS will host a new webinar, “How to Become a Certified Nuclear Professional.” More information is available below in this article.
M. Lipa, J. Schlosser, F. Escourbiac
Fusion Science and Technology | Volume 56 | Number 3 | October 2009 | Pages 1124-1149
Technical Papers | Tore Supra Special Issue | doi.org/10.13182/FST09-A9171
Articles are hosted by Taylor and Francis Online.
To fulfill the Tore Supra mission (the realization and study of high-performance long-duration discharges), the development of reliable actively cooled plasma-facing components is mandatory. This was foreseen from the beginning of Tore Supra, and since 1985, the Tore Supra team has been involved in the development and fabrication of actively cooled plasma-facing components. The initial configuration of the machine in 1988 included a 12 m2 inner first wall made of stainless steel tubes armoured with brazed graphite, outer water-cooled stainless steel panels, and modular pump limiters. This configuration, using the inner wall as limiter, allowed 20- to 30-s-duration plasma discharges to be performed. Further progress required the development of a more reliable brazing technique and a limiter support system mechanically independent of the vacuum vessel. A new configuration (Composants Internes et Limiteur project), using a completely new concept of high-heat-flux components (including notably a braze-free bond between carbon-fiber composite tiles and copper heat sink), was therefore launched in 1997. With this new configuration, discharges up to 6 min with 1 GJ of injected and removed power were achieved in 2003.