A conceptual design of a first-generation tokamak engineering test reactor is presented. The objectives, testing mission, and role in the fusion program of such a device are discussed. The physics, nuclear, and engineering design are described, and the projected operational schedule is outlined. An estimate of the cost and design!construction schedule is presented.