Belarusian Unit 2 begins commercial operation

November 8, 2023, 12:00PMNuclear News
The Belarusian nuclear plant. (Photo: Rosatom)

The second of the two VVER-1200 pressurized water reactors at Belarusian, the sole nuclear power plant in Belarus, has entered commercial operation, Russia’s state-owned atomic energy corporation Rosatom announced last week.

The latest from WNA on fleet performance and fuel

September 8, 2021, 9:30AMNuclear News

Nuclear power plants around the world generated 2,553 TWh of electricity in 2020, a drop of 104 TWh from 2019’s total, according to World Nuclear Performance Report 2021. The report was released last week by the U.K.-based World Nuclear Association.

Nuclear generation declined in Africa, North America, and Western and Central Europe, rose in Asia (but by much less than in recent years), and remained largely unchanged in Eastern Europe, South America, and Russia, the 68-page report states.

Sama Bilbao y León, WNA director general, notes in the report’s preface that although the nearly 4 percent decline “would be an unequivocal disappointment” in any other year, “in 2020, with overall electricity demand falling by around 1 percent and nuclear reactors increasingly being called upon to provide load-following support to the increased share of variable renewable generation, the resilience and flexibility shown by the global nuclear fleet tell a very positive story.”

China’s Tianwan-6 up and running

June 11, 2021, 12:59PMNuclear News
The Tianwan-6 control room. Photo: CNNC

Unit 6 at the Tianwan nuclear plant has entered commercial operation, China National Nuclear Corporation announced last week. The domestically designed ACPR-1000 pressurized water reactor becomes CNNC’s 24th unit to enter service, raising the company’s installed generating capacity to 22.5 GWe (gross).

Tianwan-5 ready for commercial operation

September 11, 2020, 9:29AMNuclear News

Unit 5 at the Tianwan nuclear plant. Photo: CNNC

Unit 5 at the Tianwan nuclear power plant completed its full-power continuous operation assessment on September 8, meeting the conditions for commercial operation, China National Nuclear Corporation reported. The domestically designed ACPR-1000 pressurized water reactor will become CNNC’s 22nd reactor to provide power to China’s electric grid, raising the CNNC fleet’s installed capacity from 19.112 million kilowatts to 20.230 million, according to the company.

Tianwan-5 construction officially commenced on December 27, 2015, with the pouring of safety-related concrete. China’s National Nuclear Safety Administration issued a 40-year operating license for the unit on July 7 of this year, and two days later CNNC announced that first fuel loading had been completed. The reactor achieved initial criticality on July 27 and connected to the grid on August 8. Once commercial operation of the unit has begun, Tianwan will boast five operating reactors.

China’s Tianwan-5 attains first criticality

August 5, 2020, 7:30AMNuclear News

Reactor operators bring Tianwan’s Unit 5 to first criticality. Photo: CNNC

Unit 5 at the Tianwan nuclear power plant in China achieved initial criticality on July 27, marking “the completion of the commissioning of the overall system and equipment of the unit,” according to Jiangsu Nuclear Power Corporation, the plant’s owner and operator.