ANS is committed to advancing, fostering, and promoting the development and application of nuclear sciences and technologies to benefit society.
Explore the many uses for nuclear science and its impact on energy, the environment, healthcare, food, and more.
Explore membership for yourself or for your organization.
Conference Spotlight
2025 ANS Winter Conference & Expo
November 8–12, 2025
Washington, DC|Washington Hilton
Standards Program
The Standards Committee is responsible for the development and maintenance of voluntary consensus standards that address the design, analysis, and operation of components, systems, and facilities related to the application of nuclear science and technology. Find out What’s New, check out the Standards Store, or Get Involved today!
Latest Magazine Issues
Nov 2025
Jul 2025
Latest Journal Issues
Nuclear Science and Engineering
December 2025
Nuclear Technology
November 2025
Fusion Science and Technology
Latest News
PWR Corrosion Control in the Nuclear Industry
As many Pressurized Water Reactors (PWRs) approach or exceed 40 years of operation, maintaining asset integrity under aging infrastructure, tight outage schedules, and strict ALARA (As Low As Reasonably Achievable) mandates is a real challenge.
Michael T. Tobin
Fusion Science and Technology | Volume 19 | Number 3 | May 1991 | Pages 679-685
Inertial Fusion | doi.org/10.13182/FST91-A29423
Articles are hosted by Taylor and Francis Online.
A neutronics analysis has been carried out to determine the effects on the Cascade ICF reactor concept of adding a solid-lithium x-ray and debris shield to each ICF capsule. Results indicate that tritium breeding in LiAlO2 is possible with a modest isotopic enhancement in 6Li (to 15%). The shallow-burial index is greater than 1 (indicating that deep burial may be required) if the blanket is kept in the reactor for more than 2.5 yr. Nine per cent of the total thermal power is unrecoverable. Parts of the chamber wall may require replacement once during the reactor life due to radiation damage. Part of the SiC chamber end cap must be replaced annually. The reactor may not require any nuclear-grade construction.