ANS is committed to advancing, fostering, and promoting the development and application of nuclear sciences and technologies to benefit society.
Explore the many uses for nuclear science and its impact on energy, the environment, healthcare, food, and more.
Explore membership for yourself or for your organization.
Conference Spotlight
Nuclear Energy Conference & Expo (NECX)
September 8–11, 2025
Atlanta, GA|Atlanta Marriott Marquis
Standards Program
The Standards Committee is responsible for the development and maintenance of voluntary consensus standards that address the design, analysis, and operation of components, systems, and facilities related to the application of nuclear science and technology. Find out What’s New, check out the Standards Store, or Get Involved today!
Latest Magazine Issues
Aug 2025
Jan 2025
Latest Journal Issues
Nuclear Science and Engineering
September 2025
Nuclear Technology
Fusion Science and Technology
August 2025
Latest News
New coolants, new fuels: A new generation of university reactors
Here’s an easy way to make aging U.S. power reactors look relatively youthful: Compare them (average age: 43) with the nation’s university research reactors. The 25 operating today have been licensed for an average of about 58 years.
W. R. Woodruff, R. S. Guido
Nuclear Technology | Volume 27 | Number 4 | December 1975 | Pages 559-622
Technical Paper | Nuclear Explosive | doi.org/10.13182/NT75-A24335
Articles are hosted by Taylor and Francis Online.
Rio Blanco was the third experiment in the U.S. Atomic Energy Commission’s Plowshare Program to develop technology to stimulate gas production from geologic formations not conducive to production by conventional means. The project was sponsored by CER Geonuclear Corporation, with the Lawrence Livermore Laboratory providing the explosives and several technical programs, such as spall measurement. Three nuclear explosives specifically designed for this application were detonated simultaneously in a minimum-diameter emplacement well using many commercially available but established-reliability components. The explosive system performed properly under extreme temperature and pressure conditions. Emplacement and stemming operations were designed with the aim of simplifying both the emplacement and reentry and fully containing the detonation products. An integrated command and control system was used with communication to all three explosives through a single coaxial cable. Reentry and the initial production testing are completed. To date 98 million standard ft3 of chimney gas have been produced.