ANS is committed to advancing, fostering, and promoting the development and application of nuclear sciences and technologies to benefit society.
Explore the many uses for nuclear science and its impact on energy, the environment, healthcare, food, and more.
Explore membership for yourself or for your organization.
Conference Spotlight
2026 ANS Annual Conference
May 31–June 3, 2026
Denver, CO|Sheraton Denver
Latest Magazine Issues
Mar 2026
Jan 2026
Latest Journal Issues
Nuclear Science and Engineering
April 2026
Nuclear Technology
February 2026
Fusion Science and Technology
Latest News
Swiss nuclear power and the case for long-term operation
Designed for 40 years but built to last far longer, Switzerland’s nuclear power plants have all entered long-term operation. Yet age alone says little about safety or performance. Through continuous upgrades, strict regulatory oversight, and extensive aging management, the country’s reactors are being prepared for decades of continued operation, in line with international practice.
Tsuyoshi Mishima, Minoru Aoki, Tadashi Muto, Tsuyoshi Amanuma
Nuclear Technology | Volume 43 | Number 2 | April 1979 | Pages 186-193
Technical Paper | The Back End of the Light Water Reactor Fuel Cycle / Fuel Cycle | doi.org/10.13182/NT79-A16310
Articles are hosted by Taylor and Francis Online.
The plutonium inventory control (PINC) system is a real-time material accountability control system that is expected to be applied to a new large-scale plutonium fuel production facility for both fast breeder reactor and heavy water reactor at the Power Reactor and Nuclear Development Corporation. The PINC is basically a system for material control but is expected to develop into a whole facility control system, including criticality control, process control, quality control, facility protection, and so forth. Under PINC, every process and storage area is divided into a unit area, which is the smallest unit for both accountability and process control. Item and material weight automatically are accounted for at every unit area, and data are simultaneously treated by a computer network system. Sensors necessary for the system are being developed.