ANS is committed to advancing, fostering, and promoting the development and application of nuclear sciences and technologies to benefit society.
Explore the many uses for nuclear science and its impact on energy, the environment, healthcare, food, and more.
Explore membership for yourself or for your organization.
Conference Spotlight
2026 Nuclear Energy Conference & Expo (NECX)
August 24–27, 2026
Dallas, TX|Hilton Anatole
Latest Magazine Issues
Jun 2026
Jan 2026
2026
Latest Journal Issues
Nuclear Science and Engineering
August 2026
Nuclear Technology
July 2026
Fusion Science and Technology
Latest News
NRC proposes security regulation changes
In 2025, President Trump issued Executive Order 14300, “‘Ordering the Reform of the Nuclear Regulatory Commission,” which directs the NRC to conduct a sweeping, multifaceted overhaul of its structure, culture, and regulations with the aim of facilitating increased deployment of new nuclear technologies and capacity.
Tonio Pinna, Fabio Borgognoni
Fusion Science and Technology | Volume 67 | Number 3 | April 2015 | Pages 531-534
Proceedings of TRITIUM 2013 | doi.org/10.13182/FST14-T72
Articles are hosted by Taylor and Francis Online.
Two of the key elements of the engineering development of the DEMO reactor are the definitions of reliability and availability requirements (or targets). The availability target for a hypothesized Fuel Cycle has been analysed as a test case. The analysis has been done on the basis of the experience gained in operating existing tokamak fusion reactors and developing the ITER design. Plant Breakdown Structure (PBS) and Functional Breakdown Structure (FBS) related to the DEMO Fuel Cycle and correlations between PBS and FBS have been identified. At first, a set of availability targets has been allocated to the various systems on the basis of their operating, protection and safety functions. 75% and 85% of availability has been allocated to the operating functions of fuelling system and tritium plant respectively. 99% of availability has been allocated to the overall systems in executing their safety functions. The chances of the systems to achieve the allocated targets have then been investigated through a Failure Mode and Effect Analysis and Reliability Block Diagram analysis. The following results have been obtained: i) the target of 75% for the operations of the fuelling system looks reasonable, while the target of 85% for the operations of the whole tritium plant should be reduced to 80%, even though all the tritium plant systems can individually reach quite high availability targets, over 90% - 95%; ii) all the DEMO Fuel Cycle systems can reach the target of 99% in accomplishing their safety functions.