ANS is committed to advancing, fostering, and promoting the development and application of nuclear sciences and technologies to benefit society.
Explore the many uses for nuclear science and its impact on energy, the environment, healthcare, food, and more.
Explore membership for yourself or for your organization.
Conference Spotlight
2026 Nuclear Energy Conference & Expo (NECX)
August 24–27, 2026
Dallas, TX|Hilton Anatole
Latest Magazine Issues
Aug 2026
Jan 2026
2026
Latest Journal Issues
Nuclear Science and Engineering
October 2026
Nuclear Technology
September 2026
Fusion Science and Technology
August 2026
Latest News
Second round of Launch Pad selections includes eight newcomers
The National Reactor Innovation Center at Idaho National Laboratory has announced 13 project selections across 12 companies for the Nuclear Energy Launch Pad, a Department of Energy–led program that integrates reactor and fuel facility authorization, testing, and deployment support for private nuclear developers.
The Launch Pad emerged from the Reactor Pilot Program and Fuel Line Pilot Program.
According to INL, projects selected include reactor development and nuclear fuel cycle advancements, including fabrication, enrichment, and conversion technologies.
P. T. Spampinato
Fusion Science and Technology | Volume 4 | Number 2 | September 1983 | Pages 194-199
Operations and Maintenance | doi.org/10.13182/FST83-A22867
Articles are hosted by Taylor and Francis Online.
The Technology Demonstration Facility (TDF) is a tandem mirror design concept carried out under the direction of Lawrence Livermore National Laboratory. It was conceived as a near-term device with a mission of developing engineering technology in a D-T fusion environment. Overall maintenance and component disassembly were among the responsibilities of the Fusion Engineering Design Center (FEDC). A configuration evolved that was based on the operational requirements of the components, as well as the requirements for their replacements. Component lifetime estimates were used to estimate the frequency and the number of replacements. In addition, it was determined that the need for remote handling equipment followed within 1.5 years after initial start-up, emphasizing the direct relationship betweem developing maintenance scenarios/equipment and the device configuration. Many of the scheduled maintenance operations were investigated to first order, and preliminary handling equipment concepts were developed.