ANS is committed to advancing, fostering, and promoting the development and application of nuclear sciences and technologies to benefit society.
Explore the many uses for nuclear science and its impact on energy, the environment, healthcare, food, and more.
Explore membership for yourself or for your organization.
Conference Spotlight
Nuclear Energy Conference & Expo (NECX)
September 8–11, 2025
Atlanta, GA|Atlanta Marriott Marquis
Standards Program
The Standards Committee is responsible for the development and maintenance of voluntary consensus standards that address the design, analysis, and operation of components, systems, and facilities related to the application of nuclear science and technology. Find out What’s New, check out the Standards Store, or Get Involved today!
Latest Magazine Issues
Sep 2025
Jan 2025
Latest Journal Issues
Nuclear Science and Engineering
September 2025
Nuclear Technology
Fusion Science and Technology
August 2025
Latest News
From operator to entrepreneur: David Garcia applies outage management lessons
David Garcia
If ComEd’s Zion plant in northern Illinois hadn’t closed in 1998, David Garcia might still be there, where he got his start in nuclear power as an operator at age 24.
But in his ninth year working there, Zion closed, and Garcia moved on to a series of new roles—including at Wisconsin’s Point Beach plant, the corporate offices of Minnesota’s Xcel Energy, and on the supplier side at PaR Nuclear—into an on-the-job education that he augmented with degrees in business and divinity that he sought later in life.
Garcia started his own company—Waymaker Resource Group—in 2014. Recently, Waymaker has been supporting Holtec’s restart project at the Palisades plant with staffing and analysis. Palisades sits almost exactly due east of the fully decommissioned Zion site on the other side of Lake Michigan and is poised to operate again after what amounts to an extended outage of more than three years. Holtec also plans to build more reactors at the same site.
For Garcia, the takeaway is clear: “This industry is not going away. Nuclear power and the adjacent industries that support nuclear power—and clean energy, period—are going to be needed for decades upon decades.”
In July, Garcia talked with Nuclear News staff writer Susan Gallier about his career and what he has learned about running successful outages and other projects.
Duck-Hoi Kim et al.
Fusion Science and Technology | Volume 64 | Number 2 | August 2013 | Pages 126-130
ITER | Proceedings of the Twentieth Topical Meeting on the Technology of Fusion Energy (TOFE-2012) (Part 1), Nashville, Tennessee, August 27-31, 2012 | doi.org/10.13182/FST13-A18066
Articles are hosted by Taylor and Francis Online.
Since the decision of blanket redesign by 2007 ITER design review, the blanket system is being developed in the framework of Blanket Integrated Product Team (BIPT) composed mainly of ITER Organization (IO) and procuring parties. Korean Domestic Agency (KODA) is mainly contributing to the design and development of blanket Shield Block (SB). In particular, KODA is supporting the design activities including electromagnetic, thermo-hydraulic and thermo-mechanical analyses to complete the final design of blanket shield block. For the manufacturing of a blanket shield block conventional fabrication techniques based on drilling, milling and welding of stainless steel forged blocks have been adopted. As a consequence of the manufacturing feasibility study, key fabrication techniques to be verified beforehand have been identified and successfully developed in collaboration with related industries. The pre-qualification program of the fabrication and testing of Full Scale Prototype (FSP) is in progress. Until now the material development of 316L(N)-IG stainless steel forging has been successfully completed, and the fabrication of FSP is on-going. Even though the procurement of blanket First Wall (FW) was withdrawn at the 9th meeting of the ITER Management Advisory Committee, the participation of the 2nd pre-qualification program of EHF (Enhanced Heat Flux) FW small scale mock is being valid for securing core engineering technologies. At present the fabricated mock-ups are waiting for high heat flux test with the Electron Beam (EB) gun test facility being newly built in Korea. This paper provides the current status of design and relevant R&D activities of the blanket system to secure key technologies and to fulfill our promise to ITER project.