The paper describes the main tasks related to Configuration Control and illustrates the means in place to assure the control over the technical baseline, schedule and cost and is describing the collaboration with the DA's towards realization on ITER site. It is further summarizing the current status of construction on site and the ongoing preparation work of the Tokamak Complex buildings with the interfaces to be defined and controlled.