ANS is committed to advancing, fostering, and promoting the development and application of nuclear sciences and technologies to benefit society.
Explore the many uses for nuclear science and its impact on energy, the environment, healthcare, food, and more.
Explore membership for yourself or for your organization.
Conference Spotlight
2026 Nuclear Energy Conference & Expo (NECX)
August 24–27, 2026
Dallas, TX|Hilton Anatole
Latest Magazine Issues
Jun 2026
Jan 2026
2026
Latest Journal Issues
Nuclear Science and Engineering
July 2026
Nuclear Technology
June 2026
Fusion Science and Technology
May 2026
Latest News
North American construction is back—smaller and faster—at OPG’s Darlington
“The nuclear renaissance is real here,” said Ontario Power Generation’s Subo Sinnathamby on May 8, one year to the day after OPG secured a final investment decision to build the first of four planned BWRX-300 reactors at its Darlington nuclear power plant, and shortly after the new reactor’s foundation was lifted into place. “We got our license to construct in April and our [final investment decision] in May, and we’ve been off to the races since.”
Toru Nakatsuka, Yoshiaki Oka, Seiichi Koshizuka
Nuclear Technology | Volume 134 | Number 3 | June 2001 | Pages 221-230
Technical Paper | Thermal Hydraulics | doi.org/10.13182/NT01-A3197
Articles are hosted by Taylor and Francis Online.
Supercritical-pressure light water-cooled reactors (SCRs) are innovative systems aimed at high efficiency and cost reduction. The once-through direct-cycle plant system is the leading system of fossil-fired power plants (FPPs). Estimates of the coolability and necessary sizes of the SCR startup systems, sequences, and required equipment for startup are investigated with reference to supercritical FPPs. There are two types of supercritical boilers. One is a constant pressure boiler, and the other is a variable pressure boiler.First, startup of the constant pressure boiler is examined. The reactor starts at a supercritical pressure. A startup bypass system consisting of a flash tank and pressure-reducing valves is required. Second, startup of the variable pressure boiler is investigated. The reactor starts at a subcritical pressure, and the pressure increases with the load. A steam-water separator and a drain tank are required for startup.The results of computer calculations show that with both constant pressure and variable pressure startup, the peak cladding temperature does not exceed the operating limit through startup, and both startup sequences are feasible. The sizes of the components required for the startup systems are assessed. To simplify the plant system and to reduce the component size, variable pressure startup with steam separators in the bypass line appears desirable.