ANS is committed to advancing, fostering, and promoting the development and application of nuclear sciences and technologies to benefit society.
Explore the many uses for nuclear science and its impact on energy, the environment, healthcare, food, and more.
Explore membership for yourself or for your organization.
Conference Spotlight
2026 Nuclear Energy Conference & Expo (NECX)
August 24–27, 2026
Dallas, TX|Hilton Anatole
Latest Magazine Issues
Jun 2026
Jan 2026
2026
Latest Journal Issues
Nuclear Science and Engineering
August 2026
Nuclear Technology
July 2026
Fusion Science and Technology
Latest News
Launching into tomorrow: NRIC guides new era of research and deployment
In June 2025, the Department of Energy announced the Reactor Pilot Program, an authorization pathway that allowed reactor developers to partner with the DOE to get first-of-a-kind (FOAK) reactors built and tested. Soon after, the DOE rolled out a complementary Fuel Line Pilot Program, which aimed to fast-track fuel projects. In all, 20 projects were accepted into the new programs.
Kenny C. Gross, B. R. Seidel
Nuclear Technology | Volume 73 | Number 3 | June 1986 | Pages 263-277
Technical Paper | Fission Reactor | doi.org/10.13182/NT86-A16070
Articles are hosted by Taylor and Francis Online.
A detailed investigation was made of historical data recorded at Experimental Breeder Reactor II during operation with superheater SU-712. The objective of this study was to analyze and characterize the performance of 72 duplex steam tubes that became unbonded during a long period of operation. The information processing system ANALYZE was developed to perform the required numerical manipulations, statistical analyses, and correlation analyses with a large data base containing some five million data values. The ANALYZE system was successfully employed (a) to characterize the performance of all the steam tubes in terms of frequency and relative serverity of unbonding, and (b) to establish a correlation between the observed anomalous behavior of the superheater and its operating parameters. Results from this investigation were used to select sections for materials examinations and physical tests that were performed after SU-712 was removed from operation.