ANS is committed to advancing, fostering, and promoting the development and application of nuclear sciences and technologies to benefit society.
Explore the many uses for nuclear science and its impact on energy, the environment, healthcare, food, and more.
Explore membership for yourself or for your organization.
Conference Spotlight
2026 ANS Annual Conference
May 31–June 3, 2026
Denver, CO|Sheraton Denver
Latest Magazine Issues
Mar 2026
Jul 2025
Latest Journal Issues
Nuclear Science and Engineering
March 2026
Nuclear Technology
February 2026
Fusion Science and Technology
April 2026
Latest News
NRC approves TerraPower construction permit
Today, the Nuclear Regulatory Commission announced that it has approved TerraPower’s construction permit application for Kemmerer Unit 1, the company’s first deployment of Natrium, its flagship sodium fast reactor.
This approval is a significant milestone on three fronts. For TerraPower, it represents another step forward in demonstrating its technology. For the Department of Energy, it reflects progress (despite delays) for the Advanced Reactor Demonstration Program (ARDP). For the NRC, it is the first approval granted to a commercial reactor in nearly a decade—and the first approval of a commercial non–light water reactor in more than 40 years.
Dmitry V. Paramonov, Mohamed S. El-Genk
Nuclear Technology | Volume 117 | Number 1 | January 1997 | Pages 1-14
Technical Paper | Fission Reactor | doi.org/10.13182/NT97-A35332
Articles are hosted by Taylor and Francis Online.
The Soviet-made TOPAZ-II space nuclear power system unit designated Ya-21u underwent a total of 15 tests both in the Union of Soviet Socialist Republic (USSR) (1989–1990) and in the United States (August 1993 to March 1995) for a cumulative test/operation time of 7681 h at conditions far exceeding design limits. These tests included steady-state operation at different power levels, fast start-ups and power optimizations, and shock and vibration tests. Test results are presented and analyzed. Results indicate a gradual change in the performance parameters such as the optimum cesium pressure and optimum load voltage. The electric power and conversion efficiency of the unit at an input thermal power of 105 kW decreased from 3.7 kW(electric) and 4% in the test in the USSR to 2.13 kW(electric) and 2.3 % in the last test in the United States. A discussion and qualitative assessment of potential causes of the performance changes of the Ya-21u unit are given.