ANS is committed to advancing, fostering, and promoting the development and application of nuclear sciences and technologies to benefit society.
Explore the many uses for nuclear science and its impact on energy, the environment, healthcare, food, and more.
Explore membership for yourself or for your organization.
Conference Spotlight
2026 ANS Annual Conference
May 31–June 3, 2026
Denver, CO|Sheraton Denver
Latest Magazine Issues
May 2026
Jan 2026
2026
Latest Journal Issues
Nuclear Science and Engineering
June 2026
Nuclear Technology
Fusion Science and Technology
Latest News
South Korea looks to Southern and NuScale
This week, the United States and South Korea have taken two steps toward deepening their nuclear partnership through two notable announcements. First, the majority-state owned Korea Hydro & Nuclear Power signed a memorandum of understanding with Birmingham, Ala.–based Southern Nuclear.
H. Y. Khater, R. T. Santoro
Fusion Science and Technology | Volume 30 | Number 3 | December 1996 | Pages 1528-1532
Safety and Environment | doi.org/10.13182/FST96-A11963167
Articles are hosted by Taylor and Francis Online.
Two-dimensional biological dose rates were calculated at different locations outside the International Thermonuclear Experimental Reactor (ITER) design. An 18° sector of the reactor was modeled in r-Θ geometry. The calculations were performed for three different pulsing scenarios. This included a single pulse of 1000 s duration, 10 pulses of 1000 s duration with a 50% duty factor, and 9470 pulses of 1000 s duration with a 50% duty factor for a total fluence of 0.3 MW˙a/m2. The dose rates were calculated as a function of toroidal angle at locations in the space between the toroidal field (TF) coils and cryostat, and in the space between the cryostat and the biological shield. The two-dimensional results clearly showed the toroidal effect, which is dominated by contribution from the activation of the cryostat and the biological shield. After one pulse, full access to the machine is possible within a few hours following shutdown. After 10 pulses, full access is also possible within the first day following shutdown. At the end of the Basic Performance Phase (BPP), full access is possible at any of the locations considered after one week following shutdown.