ANS is committed to advancing, fostering, and promoting the development and application of nuclear sciences and technologies to benefit society.
Explore the many uses for nuclear science and its impact on energy, the environment, healthcare, food, and more.
Explore membership for yourself or for your organization.
Conference Spotlight
2026 Nuclear Energy Conference & Expo (NECX)
August 24–27, 2026
Dallas, TX|Hilton Anatole
Latest Magazine Issues
Jun 2026
Jan 2026
2026
Latest Journal Issues
Nuclear Science and Engineering
August 2026
Nuclear Technology
July 2026
Fusion Science and Technology
Latest News
DOE-EM issues draft RFP for Hanford lab work, awards WIPP monitoring grant
The Department of Energy’s Office of Environmental Management issued a draft request for proposals on June 25 for the Hanford Site’s 222-S Laboratory contract. The 222-S Laboratory is the primary on-site laboratory for analysis of highly radioactive samples in support of all projects at the DOE’s Hanford Site in Washington state.
Grant B. Logan
Fusion Science and Technology | Volume 20 | Number 4 | December 1991 | Pages 992-1000
Advanced Energy Conversion/Storage and Exotic Concepts | doi.org/10.13182/FST91-A11946972
Articles are hosted by Taylor and Francis Online.
The Compact Fusion Advanced Rankine (CFARII) power cycle is a direct plasma energy conversion scheme for inertial fusion (ICF) and magnetically-insulated, inertially confined fusion (MICF) reactors utilizing: (1) conversion of plasma thermal ionization and thermal energy into kinetic energy of a supersonic plasma jet, (2) conversion of the plasma jet kinetic energy into DC electricity by slowing down in an “impulse” type of magnetohydrodynamic (MHD) generator, and (3) condensation and heat rejection of the exhaust plasma on droplets of recirculating condensate (“raindrop” condensor). A preliminary evaluation of a particular reference case CFARII Balance-of-Plant (BoP) is found sufficiently attractive (52% gross cycle efficiency, 40 million 1991 $ BoP for 1 GWe gross electric) to warrant further work on several design issues.