Nuclear News on the Newswire

BWRX-300 SMR passes U.K. regulatory milestone

GE Vernova Hitachi Nuclear Energy’s BWRX-300 small modular reactor has completed the second step of the generic design assessment (GDA) process in the United Kingdom. In this step, the U.K. Office for Nuclear Regulation, the Environment Agency, and Natural Resources Wales did not identify “any fundamental safety, security safeguard or environmental protection shortfalls with the design of the BWRX-300.” Step 1 was completed in December 2024.

Go to Article

Diablo Canyon gets key state approval

Pacific Gas & Electric has announced that the California Coastal Commission, the state agency in charge of protecting California’s roughly 840 miles of coastline, unanimously voted to approve the Act Consistency Certification and Coastal Development Permit for Diablo Canyon, a critical step in the utility’s work to extend the life of the nuclear power plant.

Go to Article

What’s the most difficult question you’ve been asked as a maintenance instructor?

Blye Widmar

"Where are the prints?!"

This was the final question in an onslaught of verbal feedback, comments, and critiques I received from my students back in 2019. I had two years of instructor experience and was teaching a class that had been meticulously rehearsed in preparation for an accreditation visit. I knew the training material well and transferred that knowledge effectively enough for all the students to pass the class. As we wrapped up, I asked the students how they felt about my first big system-level class, and they did not hold back.

“Why was the exam from memory when we don’t work from memory in the plant?” “Why didn’t we refer to the vendor documents?” “Why didn’t we practice more on the mock-up?” And so on.

Go to Article

Browns Ferry’s reactors receive subsequent license renewals

The operating licenses for the three boiling water reactors at Browns Ferry nuclear power plant, in Athens, Ala., have each been renewed by the Nuclear Regulatory Commission for an additional 20 years. The reactors, operated by the Tennessee Valley Authority, are now licensed to operate until December 2053 for Unit 1, June 2054 for Unit 2, and July 2056 for Unit 3.

Go to Article

Standard Nuclear executes OTA with DOE

Reactor-agnostic TRISO fuel producer Standard Nuclear recently announced that it has executed an other transaction agreement (OTA) with the Department of Energy. As one of the five companies involved in the DOE’s Fuel Line Pilot Program, its entrance into this deal marks a milestone in the public-private effort to bring advanced fuel production on line in support of the DOE’s concurrently running Reactor Pilot Program.

Go to Article

Five companies receive DOE awards for HALEU transport packages

Five companies are the recipients of Department of Energy awards to support the development, modification, and licensing of transportation packages for high-assay low-enriched uranium (HALEU) fuel. HALEU, which is enriched between 5 percent and 20 percent, is the type of fuel required for the operation of many of the small advanced nuclear reactors that are being designed and developed by U.S. companies.

Go to Article