ANS is committed to advancing, fostering, and promoting the development and application of nuclear sciences and technologies to benefit society.
Explore the many uses for nuclear science and its impact on energy, the environment, healthcare, food, and more.
Explore membership for yourself or for your organization.
Conference Spotlight
2026 Nuclear Energy Conference & Expo (NECX)
August 24–27, 2026
Dallas, TX|Hilton Anatole
Latest Magazine Issues
Aug 2026
Jan 2026
2026
Latest Journal Issues
Nuclear Science and Engineering
October 2026
Nuclear Technology
September 2026
Fusion Science and Technology
August 2026
Latest News
LLNL, Ampera partner to develop thorium-based TRISO fuel
Lawrence Livermore National Laboratory has formed a strategic partnership with Ampera to develop the company’s nuclear fuel concept through a project named THUNDER, for Thorium Unimodal Droplet Ejection for Reactors.
The focus of THUNDER is fabricating TRISO made with kernels of thorium rather than the usual uranium. LLNL and Ampera will evaluate and optimize liquid metal–jetting technology to produce highly uniform, spherical kernels of thorium-232 for later processing into TRISO fuel.
Mark R. Galvin, Neil E. Todreas, Larry E. Conway
Nuclear Technology | Volume 143 | Number 3 | September 2003 | Pages 270-280
Technical Paper | Fuel Cycle and Management | doi.org/10.13182/NT03-A3416
Articles are hosted by Taylor and Francis Online.
New nuclear power generation in the United States will be realized only if the economic performance can be made competitive with other methods of electrical power generation. The economic performance of a nuclear power plant can be significantly improved by increasing the time spent on-line generating electricity relative to the time spent off-line conducting maintenance and refueling. Maintenance includes planned actions (surveillances) and unplanned actions (corrective maintenance) to respond to component degradation or failure. A methodology is described that can be used to resolve, in the design phase, maintenance-related operating cycle length barriers. A primary goal was to demonstrate the applicability and utility of the methodology in the context of the International Reactor, Innovative and Secure (IRIS) design. IRIS is an advanced light water nuclear power plant that is being designed to maximize this on-line generating time by increasing the operating cycle length. This is consequently a maintenance strategy paper using the IRIS plant as the example.Potential IRIS operating cycle length maintenance-related barriers, determined by modification of an earlier operating pressurized water reactor (PWR) plant cycle length analysis to account for differences between the design of IRIS and this operating PWR, are presented. The proposed methodology to resolve these maintenance-related barriers by the design process is described. The results of applying the methodology to two potential IRIS cycle length barriers, relief valve testing and emergency heat removal system testing, are presented.