ANS is committed to advancing, fostering, and promoting the development and application of nuclear sciences and technologies to benefit society.
Explore the many uses for nuclear science and its impact on energy, the environment, healthcare, food, and more.
Explore membership for yourself or for your organization.
Conference Spotlight
2026 ANS Annual Conference
May 31–June 3, 2026
Denver, CO|Sheraton Denver
Latest Magazine Issues
Mar 2026
Jul 2025
Latest Journal Issues
Nuclear Science and Engineering
March 2026
Nuclear Technology
February 2026
Fusion Science and Technology
April 2026
Latest News
NRC approves TerraPower construction permit
Today, the Nuclear Regulatory Commission announced that it has approved TerraPower’s construction permit application for Kemmerer Unit 1, the company’s first deployment of Natrium, its flagship sodium fast reactor.
This approval is a significant milestone on three fronts. For TerraPower, it represents another step forward in demonstrating its technology. For the Department of Energy, it reflects progress (despite delays) for the Advanced Reactor Demonstration Program (ARDP). For the NRC, it is the first approval granted to a commercial reactor in nearly a decade—and the first approval of a commercial non–light water reactor in more than 40 years.
Jong Ho Lee, Soon Heung Chang
Nuclear Technology | Volume 76 | Number 1 | January 1987 | Pages 27-40
Technical Paper | Nuclear Safety | doi.org/10.13182/NT87-A33894
Articles are hosted by Taylor and Francis Online.
A small-break loss-of-coolant accident (LOCA) caused by a stuck-open power-operated relief valve is one of the important contributors to nuclear power plant risk. A pressurizer surveillance system was designed to use a microcomputer to prevent the malfunction of the system; the effect of this improvement has been assessed through probabilistic risk assessment. The microcomputer diagnoses the malfunction of the system by a process-checking method and automatically performs the backup action related to each malfunction. This improvement means that we can correctly diagnose “spurious opening,” “failure to reclose,” and “small-break LOCA,” which are difficult for operators to diagnose quickly and correctly, and by taking automatic backup action we can reduce the probability of human error.