ANS is committed to advancing, fostering, and promoting the development and application of nuclear sciences and technologies to benefit society.
Explore the many uses for nuclear science and its impact on energy, the environment, healthcare, food, and more.
Explore membership for yourself or for your organization.
Conference Spotlight
2025 ANS Winter Conference & Expo
November 9–12, 2025
Washington, DC|Washington Hilton
Standards Program
The Standards Committee is responsible for the development and maintenance of voluntary consensus standards that address the design, analysis, and operation of components, systems, and facilities related to the application of nuclear science and technology. Find out What’s New, check out the Standards Store, or Get Involved today!
Latest Magazine Issues
Oct 2025
Jul 2025
Latest Journal Issues
Nuclear Science and Engineering
November 2025
Nuclear Technology
October 2025
Fusion Science and Technology
Latest News
Sellafield awards $3.86B in infrastructure contracts to three companies
Sellafield Ltd., the site license company overseeing the decommissioning of the U.K.’s Sellafield nuclear site in Cumbria, England, announced the award of £2.9 billion (about $3.86 billion) in infrastructure support contracts to the companies of Morgan Sindall Infrastructure, Costain, and HOCHTIEF (UK) Construction.
Toru Nakatsuka, Yoshiaki Oka, Seiichi Koshizuka
Nuclear Technology | Volume 134 | Number 3 | June 2001 | Pages 221-230
Technical Paper | Thermal Hydraulics | doi.org/10.13182/NT01-A3197
Articles are hosted by Taylor and Francis Online.
Supercritical-pressure light water-cooled reactors (SCRs) are innovative systems aimed at high efficiency and cost reduction. The once-through direct-cycle plant system is the leading system of fossil-fired power plants (FPPs). Estimates of the coolability and necessary sizes of the SCR startup systems, sequences, and required equipment for startup are investigated with reference to supercritical FPPs. There are two types of supercritical boilers. One is a constant pressure boiler, and the other is a variable pressure boiler.First, startup of the constant pressure boiler is examined. The reactor starts at a supercritical pressure. A startup bypass system consisting of a flash tank and pressure-reducing valves is required. Second, startup of the variable pressure boiler is investigated. The reactor starts at a subcritical pressure, and the pressure increases with the load. A steam-water separator and a drain tank are required for startup.The results of computer calculations show that with both constant pressure and variable pressure startup, the peak cladding temperature does not exceed the operating limit through startup, and both startup sequences are feasible. The sizes of the components required for the startup systems are assessed. To simplify the plant system and to reduce the component size, variable pressure startup with steam separators in the bypass line appears desirable.