ANS is committed to advancing, fostering, and promoting the development and application of nuclear sciences and technologies to benefit society.
Explore the many uses for nuclear science and its impact on energy, the environment, healthcare, food, and more.
Explore membership for yourself or for your organization.
Conference Spotlight
2026 Nuclear Energy Conference & Expo (NECX)
August 24–27, 2026
Dallas, TX|Hilton Anatole
Latest Magazine Issues
Aug 2026
Jan 2026
2026
Latest Journal Issues
Nuclear Science and Engineering
October 2026
Nuclear Technology
September 2026
Fusion Science and Technology
August 2026
Latest News
Second round of Launch Pad selections includes eight newcomers
The National Reactor Innovation Center at Idaho National Laboratory has announced 13 project selections across 12 companies for the Nuclear Energy Launch Pad, a Department of Energy–led program that integrates reactor and fuel facility authorization, testing, and deployment support for private nuclear developers.
The Launch Pad emerged from the Reactor Pilot Program and Fuel Line Pilot Program.
According to INL, projects selected include reactor development and nuclear fuel cycle advancements, including fabrication, enrichment, and conversion technologies.
T. C. Reitz, P. A. Smuda, M. A. Benapfl
Fusion Science and Technology | Volume 26 | Number 3 | November 1994 | Pages 998-1002
Tritium Technology, Safety, Environment, and Remote Maintenance | Proceedings of the Eleventh Topical Meeting on the Technology of Fusion Energy New Orleans, Louisiana June 19-23, 1994 | doi.org/10.13182/FST94-A40285
Articles are hosted by Taylor and Francis Online.
A Portable Tritium Processing System (PTPS) has been developed at LLNL that could be applied to fusion energy related tritium processing and decontamination operations. The PTPS has four basic capabilities. These are: oil-free pumping, oil-free gas transfer, gas analysis, and gas phase tritium scrubbing. The design of the PTPS takes into consideration today's stringent release requirements, and utilizes secondary containment throughout the system. Because the system is portable, it can provide complete stand alone tritium processing, and can pass through a typical 36 inch laboratory door, and into confined spaces. This system can easily be moved to different locations within a facility such that the single tritium processing system can provide close-coupled support to multiple operations. Typical setup time for the PTPS is approximately two weeks. The PTPS has been in operation at LLNL for approximately one year. During this time, gram quantities of tritium have been successfully processed through the system. Releases to the stack attributable directly to the PTPS have been less than 0.1 curies, with most of this quantity being a product of maintenance operations.