How the NRC modernized its digital I&C infrastructure and where it goes from here

June 11, 2021, 3:20PMUpdated December 29, 2021, 2:59PMNuclear NewsEric J. Benner and Steven A. Arndt

As 2021 closes, Nuclear News is taking a look back at some of the feature articles published each month in the magazine. The June issue reviewed some topics in human factors and instrumentation and controls such as the article below that looks at the NRC's review of digital instrumentation systems in the current fleet.

The Nuclear Regulatory Commissiona first formally developed infrastructure for the review of digital instrumentation and control (I&C) systems in the 1990s. Although the current fleet of nuclear power plants in the United States was originally designed and constructed with analog systems, the U.S. nuclear industry has for more than 30 years been working to upgrade these older systems with modern digital equipment.

To continue reading, log in or create a free account!

Related Articles

DOE, NRC prepare for government shutdown

October 1, 2025, 12:03PMNuclear News

The Department of Energy and the Nuclear Regulatory Commission will furlough thousands of employees and operate at reduced capacity under a government shutdown that started after midnight on...

Valar Atomics breaks ground in Utah

September 25, 2025, 9:30AMNuclear News

El Segundo, Calif.–based reactor start-up Valar Atomics recently announced that it has broken ground on its test reactor, the Ward 250, at Utah San Rafael Energy Lab (USREL), becoming the...

NRC’s hybrid AI workshop coming up

September 18, 2025, 7:21AMNuclear News

The Nuclear Regulatory Commission will host a hybrid public workshop on September 24 from 9 a.m. to 5 p.m. (EDT) to discuss its activities for the safe and secure use of artificial...