Georgia Power resequencing Vogtle-3 and -4 planned activities

June 24, 2020, 4:07PMNuclear News

From left: Vogtle-3 and -4. Photo: Georgia Power

Southern Company subsidiary Georgia Power, primary owner of the Vogtle nuclear power plant, announced on June 23 that it is resequencing certain planned activities at Vogtle-3 and -4, the two Westinghouse AP1000 units under construction at the site near Waynesboro, Ga.

Environmental group petitions to revoke Vogtle-3 license

May 28, 2020, 12:25PMNuclear News

The Blue Ridge Environmental Defense League (BREDL), a North Carolina–based antinuclear organization, is claiming that Vogtle-3—one of two 1,100-MWe AP1000 pressurized water reactors currently under construction at the Vogtle nuclear plant near Waynesboro, Ga.—is sinking.

Final major module for Vogtle-3 installed

May 27, 2020, 5:18PMNuclear News

The CB-20 module being installed at Vogtle-3. Photo: Georgia Power

A massive water tank has been placed atop the containment vessel and shield building roof at Vogtle-3, one of two AP1000 reactors currently under construction at Southern Company’s nuclear expansion project near Waynesboro, Ga. The installation represents the final module placement for the unit and marks the latest significant milestone to be reached at the Vogtle site.

Vogtle-3 integrated head package set in place

May 19, 2020, 10:36AMNuclear News

Vogtle-3’s integrated head package. Photo: Georgia Power

Southern Company subsidiary Georgia Power has placed the integrated head package (IHP) atop the Unit 3 reactor vessel at the Vogtle nuclear expansion project near Waynesboro, Ga., marking the latest major milestone in the construction of the first new U.S. nuclear reactors in more than 30 years.

Southern gives nod to NRC on violation at Vogtle

May 13, 2020, 10:20AMNuclear News

Southern Nuclear has accepted a “white” finding (one of low to moderate safety significance) and an associated violation notice from the Nuclear Regulatory Commission for a problem at the company’s Vogtle nuclear plant, near Waynesboro, Ga. Earlier this year, Southern had contested the severity of the finding, arguing to no avail that the finding be more appropriately characterized as “green” (very low safety significance).

Vogtle work slows, but start dates remain

May 6, 2020, 3:00PMNuclear News

The Vogtle-3 containment vessel in March. Photo: Georgia Power

Despite its recent decision to trim the workforce at the Vogtle reactor construction project by about 20 percent to better address the COVID-19 pandemic, Southern Company is confident that Units 3 and 4—twin AP 1000 pressurized water reactors—will be up and running according to schedule.

Pandemic prompts cuts to Vogtle construction workforce

April 23, 2020, 5:34PMNuclear News

As a result of the COVID-19 crisis, Georgia Power Company is reducing the number of workers at its Vogtle-3 and -4 construction site, in Waynesboro, Ga., by approximately 20 percent, according to a recent joint Securities and Exchange Commission filing by the company and parent firm Southern Company.

Virus impacts could slow Vogtle construction project

April 3, 2020, 10:30AMNuclear News

Ongoing efforts to deal with the coronavirus pandemic could hinder progress at the reactor construction project currently under way at the Vogtle nuclear plant near Waynesboro, Ga., according to a Southern Company report filed on April 1 with the Securities and Exchange Commission.

Georgia Power completes fuel order for new reactors

March 11, 2020, 12:07PMNuclear News

An overhead view of the inside of Vogtle-4's containment vessel in February. Photo: Georgia Power

Georgia Power, primary owner of the Vogtle nuclear plant near Waynesboro, Ga., has ordered the first nuclear fuel load for Vogtle-4, completing the initial fuel order necessary for the startup of the reactor, as well as its twin, Unit 3, the company announced on March 5.

Tags:
Share:

First fuel loading at Vogtle Unit 3 scheduled for November

February 17, 2020, 4:11PMNuclear News

Vogtle Unit 3 (at left) is scheduled to begin operation in November 2021, one year ahead of Unit 4. Photo: Georgia Power

The Nuclear Regulatory Commission has announced an opportunity to request an adjudicatory hearing regarding Southern Nuclear’s notice of intended operation of Unit 3 at the Vogtle nuclear power plant, located in Waynesboro, Ga. The announcement was prompted by a January 13 letter from Southern Nuclear notifying the NRC of its scheduled date of November 23, 2020, for initial fuel loading at the reactor. As required under 10 CFR 52.103(a), the notification was made more than 270 days prior to the scheduled fuel load.

A combined license was issued for Vogtle-­3 and -­4, Westinghouse-­designed AP1000 pressurized water reactors, in February 2012. The license covers both construction and operation after construction is completed if standards—known as inspections, tests, analyses, and acceptance criteria (ITAAC)—identified in the combined license are satisfied. Operation will not be permitted until the NRC staff finds that all ITAACs have been met. However, if a hearing request is granted, the NRC can allow interim operation, given reasonable assurance of adequate protection of public health and safety while the adjudicatory hearing is carried out.

Share:

2019 - A Wish List in Nuclear Energy

January 10, 2019, 3:54PMANS Nuclear CafeWill Davis

Welcome to 2019!  I hope everyone who took a break enjoyed it. For those who didn't, why didn't you?  Initially, I had thoughts of trying to separate from social media and news to a significant extent during the holidays but, after conversations with Linda Zec (our wonderful ANS staff liaison for the Social Media Team, among many other things) decided that it was impractical to do so for a variety of reasons.  So, as the holiday furor ebbed and flowed and I continued, still connected, to read news and year-end summations, I found myself wishing that there wouldn't be so much frustrating news in 2019.  That's why I decided to open my eighth calendar year writing for the ANS Nuclear Cafe with a wish list, or "listicle" in the inside jargon, if you prefer.  Here, in ascending order of importance (or, I suppose, increasing order of unlikelihood) are my five wishes for this new year in nuclear energy.  (All on one screen; no annoying "next" buttons.  You're welcome.)

Nuclear Video Matinee: Vogtle Nuclear Construction Update

July 11, 2014, 3:57PMANS Nuclear Cafe

Near Augusta, Georgia, the first new commercial nuclear power reactors under construction in the United States in 30 years continue to "go vertical."  Take an inside look at the latest from the Vogtle-3 and -4 construction site, including placement of the 1.8 million pound containment vessel bottom head for Unit 4, the cooling tower for Unit 3 surpassing 300 feet, and a very interesting visit to the Port of Savannah where many of the most massive Vogtle components arrive via ship.

Nuclear Matinee: Vogtle Nuclear Construction Update

April 4, 2014, 6:00AMANS Nuclear Cafe

Near Augusta, Georgia, the first new commercial nuclear power reactors built in the United States in 30 years continue to take shape. This latest video update features the recent heavy lift of the massive 5-story CA20 module, which will house the spent fuel pool, fuel transfer canal, and other essential components for Unit 3. The video also features a visit by US Secretary of Energy Dr. Ernest Moniz, day-to-day problem-solving operations at the site's operations control center (especially during recent unusually cold weather), and the immeasurable beneficial economic and other impacts on the region's economy and school systems. Fuel loading and connection to the grid is scheduled for Unit 3 in 2017, and Unit 4 in 2018.

Nuclear Matinee: Vogtle Nuclear Construction Update

January 8, 2014, 5:57PMANS Nuclear Cafe

It's been more than two years since Vogtle Units 3 and 4 began to rise from the landscape near Waynesboro, Georgia-though construction officially began just last March with pouring of the Unit 3 basemat concrete, and a few months ago in November with the Unit 4 basemat. Turbine buildings, cooling towers, AP1000 reactor operator training... 2013 saw great strides toward the first new commercial nuclear power reactors in the United States in 30 years. Join host Joe Washington for a tour of the most recent milestones achieved in this amazing construction project.

Nuclear Matinee: Vogtle Construction Time-Lapse Video

July 26, 2013, 6:00AMANS Nuclear Cafe

A new time-lapse video shows early site preparation and containment vessel bottom head placement at the Plant Vogtle Electric Generating Plant near Waynesboro, Georgia. Two new nuclear power reactors are scheduled to begin operations at Plant Vogtle in 2017 and 2018. Along with two units under construction at the V.C. Summer Nuclear Generating Station in South Carolina, these will be the first new nuclear units built in the United States in the last three decades. Enjoy the show!