Analyses of Startup Test, Reload Limiting Transient, and Plant Event for the Kuosheng BWR-6 Related to MSIV Closure

Volume 128 · Number 2 · November 1999 · Pages 186-204
Technical Paper · RETRAN

Jan-Ru Tang, Shao-Shei Ma, Jan-Der Wang, Show-Chyuan Chiang, Lin-Yao Chou, Ching-Chuan Yao, Ying-Tsen Liao

ANS Store: Purchase Article

Three analyses are presented for the Kuosheng plant, the second nuclear power station of the Taiwan Power Company. The first is a startup test benchmark analysis of full closure of the main steam isolation valves (MSIVs). This analysis is one of a series of startup test analyses to develop the Kuosheng RETRAN model. The second is a parallel reload safety analysis of a system pressure-limiting transient for Kuosheng Unit 2, Cycle 12, which is a part of work to develop an in-house reload safety analysis methodology. The third is an operating support analysis of a reactor trip event due to a single MSIV closure in October 1997; this analysis demonstrates the application of the Kuosheng RETRAN model. The work may add to the RETRAN experience base and to the plant modeling body of knowledge. A similar approach can be adopted to support the plant, with concerns.
|

|
|
 |